This graphic is a map showing the existing service area for the water supply system including various member communities.

System map

About This Project

The Master Plan was undertaken in accordance with the process for Master Plans outlined in the Municipal Engineers Association Municipal Class Environmental Assessment document (as amended in 2024).

As part of this assignment, regional water system needs were assessed for the short and long term (20+ years) by considering growth and development potential within the region, to ensure level of service is maintained and/or enhanced. The review and evaluation of system needs considered all regional water system infrastructure including but not limited to the treatment plant, transmission mains, intermediate facilities, and terminal storage.

A virtual Public Information Centre was held on Wednesday, June 18, 2025.

To watch a recording of this Public Information Centre please visit: https://vimeo.com/1095032571/89e4683375?share=copy

The full Master Plan report is available under Documents for review, along with a separate file for the report appendices.  The 30-day public review period ended on November 28, 2025.

Who’s Listening?
Marcy McKillop, P.Eng.
Environmental Services Engineer
Phone: (519) 930-3505 ext. 4976
Email:  mmckillop@huronelginwater.ca

Alternate formats of any Master Plan documents can be made available by contacting Marcy McKillop (mmckillop@huronelginwater.ca).